Completed Projects

  1. Leader, “Optimized Optical Receiver Utilizing Silicon Based Avalanche Photodiode for Millimeter-Wave Applications”, RUG Tier 2, RM20,000.00, 1 Oct 2016 until 31 Dec 2017 (Completed).
  2. Leader, “Study on Mitigating of Power Fading at Millimeter-Wave Radio Over Fiber (Rof) Link”, RUG Tier 2 (Encouragement), RM25,000.00, 1 April 2014 until 30 June 2015 (Completed).
  3. Member, “SROI: Kelestarian Projek Pemantapan Kemahiran Di Kalangan Anak Muda”, Centre for Community and Industry Network (CCIN), RM4,000.00, 1 Sept 2018 until 30 March 2019 (Completed).
  4. Member, “Cyclic Sleep Framework for Energy Efficient Next Generation Passive Optical Network”, RUG Tier 1, RM40,000.00, 1 July 2017 until 30 Jun 2019 (Completed).
  5. Member, “Hybrid Filtered Orthogonal Multiple Access for 5G Heterogeneous Networks”, RUG Tier 1, RM40,000.00, 1 July 2017 until 31 March 2019 (Completed).
  6. Member, “Lifestyles of Underprivileged People towards Sustainable Surroundings”, UTM Razak Reseach Funding, RM32,000.00, 1 Aug 2017 until 31 July 2018 (Completed).
  7. Member, “A New Design of Remote Monitoring and Controlling of Agriculture Systems”, RUG Tier 1, RM40,000.00, 1 July 2017 until 31 Dec 2018 (Completed).
  8. Member, “Pemantapan Kemahiran Di Kalangan Anak Muda”, Centre for Community and Industry Network (CCIN), RM20,000.00, 17 Nov 2016 until 16 May 2017 (Completed).
  9. Member, “Performance of Hybrid ARQ System Using Extended Mapping Technique”, HiCOE, RM119,910.00, 1 June 2016 until 30 November 2017 (Completed).
  10. Member, “Spectral efficiency with Non Orthogonal Modulation technique in 5G communication”, HiCOE, RM119,910.00, 1 June 2016 until 30 November 2017 (Completed).
  11. Member, “New Filter Design for Multiple Access Schemes of The Fifth Generation (5G)”, HiCOE, RM119,910.00, 1 June 2016 until 30 November 2017 (Completed).
  12. Member, “Contention Resolution Using Control Packet Buffering In Optical Burst Switching Networks”, RUG Tier 2 (Encouragement), RM20,000.00, 1 Sept 2015 until 30 November 2016 (Completed).
  13. Member, “Performance Analysis of QoS Provisioning in OBS Network”, PAS Grant, RM20,000.00, 1 May 2015 until 30 April 2016 (Completed).
  14. Member, “High capacity GIDFT-nOFDM system with turbo equalization for future wireless communication”, RUG Tier 2 (Encouragement), RM25,000.00, 1 April 2014 until 30 June 2015 (Completed).
  15. Member, “A Double Pass L-Band Multiwavelength Remotely Pumped Edfa with the Integration of Raman Amplification Using Multiwavelength Dispersion Compensator”, RUG Tier 2 (Encouragement), RM24,250.00, 1 April 2014 until 30 June 2015 (Completed).
  16. Member, “Horticulture Crop Growth Response And Flowering Production In Controlled Environment For Vertical Farming Method Under Artificial Periodic Sun Lighting System”, RUG Tier 1, RM200,000.00, 1 December 2012 until 31 December 2014 (Completed).